17 August 2008
Late and Overbudget, LCS No. 1 Underway
So the first first littoral combat ship got underway at the end of last month, more than a year behind schedule, and at twice the forecast cost.
The ships, the size of a large corvette or small frigate, are intended to work in coastal waters.
Interestingly enough, the Israelis are considering the conventionally hulled LCS as the basis of a ship for their navy, but they are ditching the modular weapons system, because they feel that it leaves the ship too lightly armored.
The ships, the size of a large corvette or small frigate, are intended to work in coastal waters.
Interestingly enough, the Israelis are considering the conventionally hulled LCS as the basis of a ship for their navy, but they are ditching the modular weapons system, because they feel that it leaves the ship too lightly armored.
Labels:
Defense Procurement
,
Naval
,
technology
0 comments :
Post a Comment