19 February 2008
Navy Looking at C-2 Replacements...Not Gonna Happen
This report (paid subscription required) says that the Navy wants to start replacing the C-2 in 2017, with a complete replacement by 2026.
They are planning to let out the contract in 2011.
It's not going to happen. Big defense cuts are on the way, and the 6 year time frame for designing what has to be a from scratch replacement (carrier landings, folding wings) given the ponderous nature of defense procurement.
They are planning to let out the contract in 2011.
It's not going to happen. Big defense cuts are on the way, and the 6 year time frame for designing what has to be a from scratch replacement (carrier landings, folding wings) given the ponderous nature of defense procurement.
Labels:
Aviation
,
Defense Procurement
,
Military
,
Naval
0 comments :
Post a Comment